Availability: | |
---|---|
Quantity: | |
20FT ISO standard container tank for Oversea market.
Work time : 90 ~120 days
Type: 20' x 8 ' x 8 ' 6" Full frame Collar type UN Container Tank for Carrying bulk cement
Capacity: 22000 Litres+/-2%
MAGW: 36000 KG
Tare: up to 4500 KG
Design Pressure: 2.0 BAR
Working Pressure: 2.2BAR ≥8M3/min
Test Pressure: 2.6 BAR
External Pressure: 0.41 BAR
Design Temperature: -20ºC to 110ºC
Material: Q345R
Thickness: Shell 5mm, Head: 6mm
Frame Q345D
Design Code: SB/T10561-2010, IMDG CODE 36-12
Third Party Inspection: CCS (China Classification Society)
Fittings
Manlid: 2*500mm dia low profile manlid.
Relief Valve: 1*2" Relief Valve .
Inlet Air Valve: 4*2" Airline Ball Valve
Outlet Air Valve:1*2" Airline Ball Valve
Bottom Discharge Assembly:2*4" bottom discharge butterfly valve assembly
Walkway: "H" Style Marine Grade Aluminium Q grating with ladder on the right.
Gas Fluidized Bed:
Air bag fluidized bed (V type two storehouse type), tank body adopts double cone inside tilting horizontal structure, two storehouses at the same time intake and discharge, two storehouses can be fed at the same time.
Loading:
After opening the outlet air valve and making the pressure in the tank return to zero (check the value of the pressure gauge), open the manhole and load the material into the tank. After loading, clean the powder at the inlet to ensure the sealing performance
Unloading:
1 . Connect the unloading pipe to ensure reliable sealing,
2. Close unloading valve, external air connection valve and secondary air valve,
3. Connect the inlet pipe to ensure reliable sealing; Open the air inlet valve, open the external air source, and inflate the gas chamber in the tank; When the pressure inside the tank -- that is, the pressure gauge reading reaches 2BAR, open the discharge valve (if the pressure continues to rise, the pipe is blocked). Discharge pressure shall be maintained between 1.8 and 2.4BAR. When the unloading is completed and the pressure in the tank drops to 0.2BAR, open the secondary air ball valve to dredge all the unloading pipes.
4. Shut off the air source after unloading; Open the out airline valve to discharge the pressure in the tank.
It
1.Are you trading company or manufacturer ?
We are Group Corporation manufacturer ,have Group Factories Contractor.Don't worry,dear.We have joined the trade assurance,if the products have quality problems when you received them,the payments can be refund to you.
20FT ISO standard container tank for Oversea market.
Work time : 90 ~120 days
Type: 20' x 8 ' x 8 ' 6" Full frame Collar type UN Container Tank for Carrying bulk cement
Capacity: 22000 Litres+/-2%
MAGW: 36000 KG
Tare: up to 4500 KG
Design Pressure: 2.0 BAR
Working Pressure: 2.2BAR ≥8M3/min
Test Pressure: 2.6 BAR
External Pressure: 0.41 BAR
Design Temperature: -20ºC to 110ºC
Material: Q345R
Thickness: Shell 5mm, Head: 6mm
Frame Q345D
Design Code: SB/T10561-2010, IMDG CODE 36-12
Third Party Inspection: CCS (China Classification Society)
Fittings
Manlid: 2*500mm dia low profile manlid.
Relief Valve: 1*2" Relief Valve .
Inlet Air Valve: 4*2" Airline Ball Valve
Outlet Air Valve:1*2" Airline Ball Valve
Bottom Discharge Assembly:2*4" bottom discharge butterfly valve assembly
Walkway: "H" Style Marine Grade Aluminium Q grating with ladder on the right.
Gas Fluidized Bed:
Air bag fluidized bed (V type two storehouse type), tank body adopts double cone inside tilting horizontal structure, two storehouses at the same time intake and discharge, two storehouses can be fed at the same time.
Loading:
After opening the outlet air valve and making the pressure in the tank return to zero (check the value of the pressure gauge), open the manhole and load the material into the tank. After loading, clean the powder at the inlet to ensure the sealing performance
Unloading:
1 . Connect the unloading pipe to ensure reliable sealing,
2. Close unloading valve, external air connection valve and secondary air valve,
3. Connect the inlet pipe to ensure reliable sealing; Open the air inlet valve, open the external air source, and inflate the gas chamber in the tank; When the pressure inside the tank -- that is, the pressure gauge reading reaches 2BAR, open the discharge valve (if the pressure continues to rise, the pipe is blocked). Discharge pressure shall be maintained between 1.8 and 2.4BAR. When the unloading is completed and the pressure in the tank drops to 0.2BAR, open the secondary air ball valve to dredge all the unloading pipes.
4. Shut off the air source after unloading; Open the out airline valve to discharge the pressure in the tank.
It
1.Are you trading company or manufacturer ?
We are Group Corporation manufacturer ,have Group Factories Contractor.Don't worry,dear.We have joined the trade assurance,if the products have quality problems when you received them,the payments can be refund to you.